Arlington Water Transmission Pipe
Concrete water transmission pipe rehabilitation at the Pierce-Burch Water Treatment Plant in Arlington, Texas. 54-inch concrete pipe, 420 ft — completed in 8 days (scheduled for 14).
Projects

December 17, 2025
Concrete water transmission pipe rehabilitation at the Pierce-Burch Water Treatment Plant in Arlington, Texas. 54-inch concrete pipe, 420 ft — completed in 8 days (scheduled for 14).

November 17, 2025
23 years of aggressive wastewater conditions had caused significant deterioration in concrete clarifiers. Cracking, leaking joints, and failing grout lines threatened long-term operation — patchwork repairs were no longer enough.

October 15, 2025
Morrilton WWTP faced degradation and loss of efficiency to water augur — a full restoration that brought structural integrity and operational performance back online.
Client voices
"I am very satisfied with the work that has been completed on our previous manhole rehab project with Midwest Infrastructure Coatings. The OBIC multi-layer lining was incredibly efficient and the job took little time to complete. The crew exceeded expectations and was able to complete objectives with minimal oversight. I would highly recommend these services."

Zac Hall
Water Systems Designer · Conway Corp
"OBIC Armor 1000 is far superior to any other manhole lining product available. The elongation keeps the chimney and frame sealed to the cone, eliminating major points of infiltration. The SWAT testing for H2S and the ten-year warranty stamped in the chimney are why we chose this over cementitious or epoxy lining. MIC has been great to work with."

Jeff Conway
Superintendent, Sewer Maintenance Division · City of Independence
"We chose Midwest over other competitors because we needed a long-term solution. The benefits we're reaping are increased protection from H2S gas, no deterioration in coated manholes, increased visibility for inspections, and a ten-year warranty. Midwest was extremely efficient and finished ahead of schedule without compromising quality."

Robert Allison
Public Works · Owasso, OK
"Since having the OBIC applied, sanitary sewer overflows have reduced dramatically. The structural integrity of those manholes has improved greatly, and even visibility during inspections is much better. The crews are easy to work with and do a wonderful job of minimizing the inconvenience the work has on residents."

Sean Davis
Public Works · Huntsville, AR
"A separate contractor suggested a coating process that would require a 28-day cure time while Midwest provided a solution that cured in just 15 minutes after application. Their efficiency exceeded our expectations. The 3-part coating system, warranty date stamping, and fast cure time are real advantages."

Paul Graham
Utility Director · Heber Springs Water and Wastewater
"Midwest Infrastructure Coatings exceeded our expectations from start to finish. The crew's professionalism, knowledge, and expertise made the process seamless. From their outstanding product to their skilled installation and sales teams, they deliver on every level."

Travis Willis
Assistant General Manager · City of Pryor Creek
"Everyone on the job was committed to the quality of the product. Our expectations have been surpassed — the way it covered up those old brick manholes around town was very impressive. The communication from applicators to sales team was great."

Justin Smith
Superintendent · Vinita, OK
"The 10-year warranty stamped directly on top of the manhole stood out to me most. The application crew mobilized quickly and completed on-site work in a timely manner. The salesman and crew were communicative on progress, and the final report was excellent."

Zayne Bryson
Engineering Director · Russellville, AR — City Corporation